a r t n e t w e b
MIT EXHIBITION
WORK-FLOW
SCHEDULE
CONCEPT: Present the flux of digital culture
in the networked environment of the Internet
as a two month exhibition at the List
Visual Arts Center at MIT.

PHASE INDEX AND WORK-FLOW SCHEDULE

PHASE DESCRIPTION MONTH
Phase 1 Concept Identification Oct
Phase 2 Concept Development Oct/Nov
Phase 3 Concept Design Nov
Phase 4 Site Design
(Physical and Digital)
Nov/Dec
Phase 5 Network Development Nov/Dec
Phase 6 Final Integrated Design
(Concept, Site and Network)
Dec
Phase 7 Visual Graphics Production
(Credit, Labels, Post Card, Wall Treatment)
Dec/Jan
Phase 8 Fabrication and Construction
(Boxes, Tables, Screen)
Dec/Jan
Phase 9 Installation and Review Jan
Phase 10 Follow-up Review March
PHASE DESCRIPTION MONTH

(HOME)

a r t n e t w e b